Skip to main content

In Ground, Fiberglass Pool Installation

Brummett Pools can typically install a one-piece, in ground, fiberglass swimming pool in 10-12 working days.

Here is how:

1 Excavate and level the small gravel base

Excavate and level the small gravel base Excavate and level the small gravel base Excavate and level the small gravel base

2 Deliver and position the fiberglass pool

Deliver and position the fiberglass pool Deliver and position the fiberglass pool Deliver and position the fiberglass pool

3 Backfill with dense grade and fill the pool with water

Backfill with dense grade and fill the pool with water Backfill with dense grade and fill the pool with water Backfill with dense grade and fill the pool with water

4 Pour concrete patio and construct any features

Pour concrete patio and construct any features Pour concrete patio and construct any features Pour concrete patio and construct any features

5 Add the finishing touches and enjoy!

Add the finishing touches and enjoy! Add the finishing touches and enjoy! Add the finishing touches and enjoy!

Why a Fiberglass Pool?

  1. Fiberglass pools are 90% less maintenance than vinyl, concrete or gunite pools.
  2. Fiberglass pools never have to be drained.
  3. Fiberglass pools require fewer chemicals.
  4. Fiberglass pools from Leisure Pools® have a lifetime warranty*

*through Leisure Pools®


I would recommend Brummett Pools to anyone looking to have a pool. Owners and staff were very professional.

Jennifer M.


Everyone with Brummett Pools was excellent from start to finish. They did a great job!

Mike & Carol F.