Pool Installation

Brummett Pools can normally install a one-piece fiberglass pool in 10-12 working days.

This is how it is done:

Excavate and level sand base...

  • excavate 1
  • excavate 2
  • excavate 3
  • excavate 4

Install one-piece fiberglass pool...

  • install 1
  • install 3

Backfill with sand and fill pool with water...

  • backfill 1
  • concrete 1

Pour concrete patio and construct retaining wall...

  • concrete 2
  • concrete 3
  • concrete 4
  • concrete

Enjoy!

  • ENJOY!!